Quality Control Procedure :
 



  General :

The quality assurance method includes three principal stages :

Quality control for raw material
Quality control during the process (follow up)
Final quality control after installation (completion)
  Quality control for raw material
For the purpose of quality for raw material, a simple sampling method has been developed enabling g the acceptance/rejection of material according to the number of defects discovered in a random sample taken from the delivery.
The special level of examination is : MIL-STD-105-E QC-001
   
 
 Portion size Sample size No.of defective for acceptance No.of defective for
 rejection
1-500
5
0
1
501-35,000
20
1
2
   
  Examination of the raw material will be implemented according to the inspection specifications defined for each type of raw material
   
  The following table details the types of raw material and the number of the appropriate inspection specifications :
   
 
Sr.No
  Type of product   Specification no.
1
 
Aluminum profiles and platform
 
QC-102
2
 
Glass
 
QC-103
3
  Handles for doors and windows  
QC-108
4
  Rubber for glazing  
QC-109
5
  Silicone  
QC-110
6
  Screws  
QC-112
   
  The results of the quality control will be recorded on the Inspection of “Intake from Suppliers form” (no. QA-5)
   
  Quality control in process (follow up)
As part of the BGA 2000 project, Alumayer is handling several areas. A process quality control procedure has been defined for each area and an associated form prepared
  The following table shows the inspection procedure and the appropriate form number for each area :
   
 
Sr.No
Area Contract chapter Procedure no. Form no.
1
Curtain walls
12/06
QC-115
QA-10
2
Aluminum windows
12/02
QC-116
QA-11
3
Glass railings
06/06
QC-117
QA-12
4
Aluminum ceilings
22/06
QC-118
QA-13
5
Aluminum doors
12/01
QC-119
QA-14
6
Skylights
12/12
QC-115
QA-15
7
Metal panel system
12/08
QC-120
QA-16
   
  Each installed unit will undergo a quality controll inspection
   
  Control will be implemented by the quality assurance director, the heads, and employees authorized to perform the above-mentioned inspection activities.
   
  Once a month, copies of the quality control forms will be forwarded to the quality office in Aronson Ltd.
   
   Final quality control for installation on site
  After completing a given installation on the site, installation quality control will be

implemented Quality control will be implemented by the implementation director

Results of the inspection will be recorded on form QA-15
   
 